To see where the work will be located, view the interactive map above. Click on the construction areas for more details.
Click and drag to explore the map. Click lines, shapes and icons for more information. Turn layers on and off and browse the list of projects by clicking the button in the upper left of the map window. (You may need to turn off layers to select other objects underneath.) Map shapes and icons are provided for reference only, precise locations may vary.
Si desea obtener este información traducida al español, por favor llamar al 503-731-4128.
Update or install new curb ramps on OR 47 through Carlton.
Construction crews will be working on ADA curb ramp projects throughout Oregon. We will schedule construction based on crew availability. There may be breaks in the construction schedule when crews are constructing ramps in other cities before they return to Carlton.
What to expect during construction:
Construction will begin in 2021.
OR 47 from milepost 37.36 to 38.45.
Upgrade or install new ADA curb ramps on OR 99E through Aurora.
Construction crews will be working on ADA curb ramp projects throughout Oregon. We will schedule construction based on crew availability. There may be breaks in the construction schedule when crews are constructing ramps in other cities before they return to Aurora.
What to expect during construction:
Construction will begin in 2021.
OR 99E from milepost 24.87 to 25.75 through Aurora.
Upgrade or install new ADA curb ramps on OR 99W through Monroe.
Construction crews will be working on ADA curb ramp projects throughout Oregon. We will schedule construction based on crew availability. There may be breaks in the construction schedule when crews are constructing ramps in other cities before they return to Monroe.
What to expect during construction:
Construction will begin in 2021 providing funding is available.
OR 99W from milepost 100.58 to 101.19 through Monroe.
Upgrade or install new ADA curb ramps on Territorial Highway through Veneta.
Construction crews will be working on ADA curb ramp projects throughout Oregon. We will schedule construction based on crew availability. There may be breaks in the construction schedule when crews are constructing ramps in other cities before they return to Veneta.
What to expect during construction:
Construction will begin in 2021.
Territorial Highway from milepost 18.19 to 21.03 through Veneta.
Upgrade or install new ADA curb ramps on OR 99 through Junction City.
Construction crews will be working on ADA curb ramp projects throughout Oregon. We will schedule construction based on crew availability. There may be breaks in the construction schedule when crews are constructing ramps in other cities before they return to Junction City.
What to expect during construction:
Construction will begin in 2021.
OR 99 from milepost 108.85 to 109.81 through Junction City.
Upgrade or install new ADA curb ramps on OR 99E through Harrisburg.
Construction crews will be working on ADA curb ramp projects throughout Oregon. We will schedule construction based on crew availability. There may be breaks in the construction schedule when crews are constructing ramps in other cities before they return to Harrisburg.
What to expect during construction:
Construction will begin in 2021 providing funding is available.
OR 99E from milepost 28.31 to 28.99 through Harrisburg.
Our goal is to improve accessibility and safety for users on our highways through Sweet Home. We are currently in the design phase where we are reviewing all the intersections and curb ramps in the project area.
As part of the project, we are looking at:
Construction crews will be working on ADA curb ramp projects throughout Oregon. We will schedule construction based on crew availability. There may be breaks in the construction schedule when crews are constructing ramps in other cities before they return to Sweet Home.
What to expect during construction:
Construction will begin in 2021.
U.S. 20 from milepost 26.64 to 30.71 and OR 228 from milepost 20.59 to 21.38 through Sweet Home.
This project will rebuild approximately 58 corners in South Corvallis on OR 99W.
Construction crews will be working on ADA curb ramp projects throughout Oregon. We will schedule construction based on crew availability. There may be breaks in the construction schedule when crews are constructing ramps in other cities before they return to Corvallis.
What to expect during construction:
Visit the project webpage for more information.
Construction will likely begin in January and be completed in November 2021.
From SE Chapman Place to SW McKenzie Avenue.
This project will rebuild approximately 102 existing corners along U.S. 101 in Florence.
Construction crews will be working on ADA curb ramp projects throughout Oregon. We will schedule construction based on crew availability. There may be breaks in the construction schedule when crews are constructing ramps in other cities before they return to Florence.
What to expect during construction:
Visit the project webpage for more information.
Construction will likely begin in early 2021 and be completed by November 2021. Sign up to receive construction updates to learn more about the project as we get closer to construction.
Between OR 126/10th Street and Munsel Lake Road.
The project will do the following:
The project will benefit the 35,000 motorists and the many bicyclists and pedestrians that use this section of highway each day.
Check out the interactive map below to see where the improvements will be made.
We may be constructing more than one area at the same time. We don't plan to have any full road closures, expect single lane closures with flagging. Paving will be done at night. We don't have a contractor on board yet, but here are the times by area that work will be allowed:
When we have a contractor we will be able to share a more specific schedule, sign up for project alerts and visit TripCheck for the most up to date information.
Construction will begin in 2021.
OR 221 | Wallace Road in West Salem, Polk County.
Click and drag to explore the map. Click lines, shapes and icons for more information. Turn layers on and off and browse the list of projects by clicking the button in the upper left of the map window. (You may need to turn off layers to select other objects underneath.) Map shapes and icons are provided for reference only, precise locations may vary.
We will remove and replace the nine existing street lights including the foundation, poles and arms. We will replace them with LED fixtures.
We will also be installing three new LED street lights.
The 12 new lights will be brighter and more energy efficient.
All of the project work will be done with shoulder closures. We will not have detours, but there may be some delays and you may see some flaggers helping direct traffic as needed.
Expect to see our crews working Monday through Thursday from 7 a.m. to 5 p.m.
Construction may begin in March and continue through April 2021.
OR 22 | Between milepost 20.31 and milepost 20.46.
The project will improve a rough section of pavement on OR 99W. The 6.25 mile project includes 1.1 miles within McMinnville, .5 miles through Lafayette and 4.65 miles of rural highway.
This is a pavement preservation project that includes:
January – August
May – September
When we have a contractor we will be able to share a more specific schedule, sign up to receive construction updates, or visit TripCheck for the most up to date information.
Construction will begin in 2021.
McDougall Junction, OR 18/OR 99W, through Lafayette to McDonald Way in McMinnville.
Planned roadway improvements will give motorists a smoother ride. Installation of new sidewalks and streetscape will make it safer for pedestrians and bicyclists using OR 99W.
We will:
Full details are on the project webpage or on the interactive map to the right.
During construction, we are planning for single lane closures. Crews have the option to work nightly, Sunday night through Friday morning, between 9 p.m. and 4 a.m.
You can read our recommendation to the contractor to learn more about possible impacts, please note that the contractor will be able to make changes as needed. When we have a contractor we will share a more specific schedule. Sign up to receive construction updates, or visit TripCheck for the most up to date information.
Construction will take two seasons and will begin in 2021.
SE Parks Drive in Dundee to 1st Street.
Click and drag to explore the map. Click lines, shapes and icons for more information. Turn layers on and off and browse the list of projects by clicking the button in the upper left of the map window. (You may need to turn off layers to select other objects underneath.) Map shapes and icons are provided for reference only, precise locations may vary.
The OR 551 and Ehlen Road NE intersection has been identified as a location for safety improvements. With the current intersection layout, a car waiting to make a left turn creates congestion. To reduce congestion and improve operations at the intersection we will:
For more details about the project, visit the project webpage.
Construction activities will take place at different times:
Traffic and movement through the work zone will be controlled by flaggers and lanes will be clearly marked.
Detours may be needed if the construction of Julia Road is not complete before we install the traffic separator. The detour routes will only be necessary for traffic accessing Ehlen Road and Boones Ferry Road. The traffic on OR 551 will mostly be unaffected. For the most up to date information during construction, visit TripCheck, or sign up to receive construction updates.
Construction will begin in 2021.
OR 551 and Ehlen Road NE intersection.
Click and drag to explore the map. Click lines, shapes and icons for more information. Turn layers on and off and browse the list of projects by clicking the button in the upper left of the map window. (You may need to turn off layers to select other objects underneath.) Map shapes and icons are provided for reference only, precise locations may vary.
The South Yamhill River Bridge was built in 1951, is in poor condition and needs to be replaced.
We will replace the existing 35 foot wide South Yamhill River Bridge with a new 49 foot wide bridge that will better accommodate trucks, vehicle traffic, bicyclists and pedestrians.
The bridge will have seven foot wide shoulders and a five foot six inch walkway. We will install decorative street lighting for the bridge walkways.
We will build a temporary diversion bridge to the west of the existing bridge. This temporary bridge will allow us to remove the existing bridge and build the new bridge at the same alignment with the highway. The temporary bridge will be wider than the existing road, with a 29 foot roadway and six foot walkway.
Construction will begin in 2021 and is expected to last four years.
2021
2022-2023
2024
When we have a contractor we will be able to share a more specific schedule, sign up to receive construction updates, or visit TripCheck for the most up to date information.
McMinnville Spur, Three Mile Lane | South Yamhill River Bridge.
We will install protective bridge screening to help prevent objects from being dropped onto the roadway below. These falling objects could injure motorists and pedestrians or create road hazards.
We will need to close a lane on OR 22 under the section of the bridge where our crews are working. The closed lane will shift as the crews install the screening on the other side of the bridge.
Our plan is to start with the Albus Road SE bridge and move west, ending with the Lancaster Drive SE. To find out the most up to date information during construction visit TripCheck or sign up to receive construction updates.
Construction may begin in late December 2020 and continue through April 2021.
You can expect to see crews working:
OR 22 at Lancaster Drive SE | Cordon Road | 72nd Avenue SE | Albus Road SE
We will install a crosswalk at the intersection of OR 99E and Williams Avenue to make the area safer for pedestrian by:
Our crews have the option to work during the following times:
When we have a contractor we will be able to share a more specific schedule, sign up for construction updates, or visit TripCheck for the most up to date information.
Expect to see single lane closures, some delays and traffic control. Pedestrians will be detoured around the immediate work area where ramps are being constructed. Bicycle traffic will remain on the roadway during construction with signs to alert drivers.
Construction will begin in 2021.
OR 99E | Williams Avenue intersection.
Rumble strips are grooves in the pavement that create vibration and sound to alert motorists when they are leaving a lane. Rumble strips can reduce the number of roadway departure fatalities (by 20%) on the targeted highway segments, making them a successful, low-cost countermeasure.
During construction, expect localized noise as the rumble strips are ground into the pavement by machinery. Access to highways will not be affected; however, motorists should anticipate temporary lane closures with flaggers controlling traffic, creating short delays.
This project started in 2020 to install rumble strips at 19 locations across the region. The work at each location is expected to be completed in 2021.
Various locations throughout the region. See the project map and schedule for the specific sections where work needs to be completed.
Click images to enlarge.
Visit Trip Check for the most up-to-date information and sign up to receive construction updates for Yamhill, Polk and Marion counties.
Visit Trip Check for the most up-to-date information and sign up to receive construction updates for Yamhill, Polk and Marion counties.