An effort is underway to restore all 73 miles of the Historic Columbia River Highway from Troutdale to The Dalles.

Currently, 68 of those 73 miles are connected. Some segments will be accessible to cars and cyclists. Some segments, known as the Historic Highway State Trail, will be accessible only by people walking, rolling or biking. Three segments of the Historic Highway State Trail make up the remaining five miles.

Click through the stations below to learn more about each segment.  

Three segments remain between Viento State Park and Hood River.

Use finger to scroll map on mobile.

About the Historic Columbia River Highway

Constructed between 1913 and 1922, the Historic Columbia River Highway overcame all odds. At the turn of the century, after visiting Europe’s great roads, two men -- Sam Hill and Sam Lancaster -- had a vision to create an even better road here in the United States designed exclusively for this new contraption called the automobile. This road would lay lightly on the land and take its users to the most beautiful spots and breathtaking vistas of the Columbia River Gorge. 

In the early 1950s, many miles of the Historic Columbia River Highway were damaged or destroyed to pave the way for Interstate 84. The passage of the Columbia River Gorge National Scenic Area Act in 1986 motivated the Oregon State Legislature to commit to restore the entire Historic Highway to its glory days of the 1920s. 

For More Information

Contact Katelyn Jackson, ODOT Community Affairs
Katelyn.Jackson@odot.state.or.us | 503-731-8503

Or Terra Lingley, Columbia River Gorge National Scenic Area Coordinator
Terra.M.Lingley@odot.state.or.us | 503-731-8232

Sign up for email updates about the Historic Columbia River Highway and State Trail. 

Stations

A trail segment that connects from Viento State Park on the west to Mitchell Point in the east
Recreating the Mitchell Point Tunnel
The final stretch into Hood River

Viento State Park to Mitchell Point

Length:

2.7 miles

Schedule:

Design continues through early 2021. We submitted the National Scenic Area permit to Hood River County and it has been approved. We plan to begin construction in 2022. 

Overview:

This segment of trail connects the existing Historic Highway State Trail at the Viento Trailhead to Mitchell Point and includes reconnecting 0.67 miles of original sections of the Historic Highway. 

The project includes upgrades to the Viento Trailhead and improvements to the South Viento State Park Campground, including a new restroom. This segment of trail will cross Perham and Mitchell Creeks with two bridges with a look consistent with recent projects.

Construction of this trail segment will be challenging along the steep slopes and close proximity to the freeway. A mix of rockfall fences and rockfall mesh will be installed on six slopes adjacent to trail and I-84 with large cranes or helicopters to improve safety for trail and interstate users. 

Open gallery full-screen Use the mouse wheel to pan and zoom, or pinch and swipe on touch-enabled devices.
Close
  • A historic view looking east approaching Mitchell Point.

    A historic view looking east approaching Mitchell Point.

  • A rendering of the Viento Trailhead and campground.

    A rendering of the Viento Trailhead and campground.

  • A rendering of the Perham Creek Bridge.

    A rendering of the Perham Creek Bridge.


50% Complete

Mitchell Point Tunnel

Length:

1.5 miles (total trail length)

Schedule:

Design is complete on this project. We anticipate construction beginning in early 2021 and taking about two years to complete. 

The iconic Mitchell Point Tunnel was a highlight of the original Historic Highway, but the construction of Interstate 84 destroyed the tunnel. 

Now, we are preparing to break ground on constructing a new tunnel. There will soon be a 655-foot tunnel with five arched windows at Mitchell Point.
 

Design elements:

Arched windows

Through the design process, we were able to allow for five arched windows along the tunnel. This design is historically consistent with the original tunnel.

Lighting

Based on studies of other tunnels and simulations on different options, we concluded that natural light alone will be sufficient for trail users to transition from the outside light to inside the tunnel. There will be no artificial lighting inside the new tunnel.

Rockfall Mitigation

After simulating rockfall conditions, we have determined that rockfall mesh and fencing is necessary at both entrances, or portals, to the tunnel. The rockfall mitigation will increase safety by reducing the potential for rocks to land on the trail. By modifying the design, we were also able to minimize impacts to the vegetation on the slope.

Traffic

We will direct trail users to the parking lot off Exit 58 for Mitchell Point. Signs will note Mitchell Point Drive is local access only and we will provide a turnaround for emergency vehicle access.

Slowing down cyclists

On each side of the tunnel, bands of stone will be inset into the trail. These bands, as shown in the above photo, will give visual and physical cues to trail users that the tunnel entrance is ahead.

Project history

Mitchell Point was the site of the iconic tunnel with its five arches overlooking the Columbia River. It was constructed in 1915, closed and filled in 1953 and destroyed in 1966 when blasting was required to widen the water-level highway (now Interstate 84). 

Mitchell Point is a formidable mountain that requires a structure to connect the western segments of the State Trail to Hood River and The Dalles. This segment received funds to design and construct a crossing to Mitchell Point into the Historic Columbia River Highway State Trail.

In 2015, ODOT’s consultant began evaluating seven alternatives for constructing a crossing at Mitchell Point. These alternatives included tunnels, viaducts (bridges over land), combinations of both and a trail alongside I-84. 

Over time, the alternatives were narrowed down to three options for consideration: an intermediate length tunnel, a long tunnel or a bridge and trail. In 2018, we presented the alternatives for public comment. Based on public comment, the Historic Columbia River Highway Advisory Committee recommended the intermediate length design alternative, which was endorsed by the Oregon Parks and Recreation Commission. 

We continued to refine the design and ODOT applied for and received the National Scenic Area Permit. 

Open gallery full-screen Use the mouse wheel to pan and zoom, or pinch and swipe on touch-enabled devices.
Close
  • Approaching the historic Mitchell Point Tunnel from the west.

    Approaching the historic Mitchell Point Tunnel from the west.

  • The stonework design for the tunnel entrances.

    The stonework design for the tunnel entrances.

  • A rendering of the east entrance to the tunnel.

    A rendering of the east entrance to the tunnel.

  • A rendering of the west entrance to the tunnel.

    A rendering of the west entrance to the tunnel.

  • A rendering of the redesigned parking lot.

    A rendering of the redesigned parking lot.


75% Complete

Ruthton Point to Hood River

Length:

1.6 miles

Schedule:

Design remains in early stages as we pursue funding opportunities for construction. 

Just west of the City of Hood River, a section of the Historic Highway with world-class views of the Columbia River Gorge awaits to be reconnected as part of the Historic Highway State Trail. 

This segment of trail will extend eastward from Mitchell Point on Mitchell Point Drive, cross underneath I-84, and proceed east to Hood River. We will build a trail on the north side of I-84 to connect with Ruthton Park, including restoring a section of original Historic Highway. 

Plans currently include replacing the narrow and short undercrossing under I-84 with a new undercrossing just west of the existing location. The likely design would retain one-way vehicle traffic with a separated two-way path for trail users.

Next steps

We plan to apply for the Nationally Significant Federal Lands and Tribal Projects program call for projects anticipated in 2020. Some investigation and exploration work is anticipated to take place soon.

Connect with the project team

  1. Sign up for email updates about the Historic Columbia River Highway and State Trail to stay informed as the project progresses. 
  2. Visit the www.HistoricHighway.org to learn more about the Historic Highway.
  3. Send questions or comments to the project team

Thank you for participating!

Open gallery full-screen Use the mouse wheel to pan and zoom, or pinch and swipe on touch-enabled devices.
Close
  • A historic photo from Ruthton Point.

    A historic photo from Ruthton Point.

  • A historic photo from Ruthton Point.

    A historic photo from Ruthton Point.

  • Existing conditions at Ruthton Point.

    Existing conditions at Ruthton Point.

  • An aerial view, looking west back toward Mitchell Point.

    An aerial view, looking west back toward Mitchell Point.


100% Complete